![]() ![]() J Oper Res Soc 55: 54–64īeasley JE, Sonander J, Havelock P (2001) Scheduling aircraft landing at London heathrow using a population heuristic. ![]() Transport Sci 34: 180–197īeasley JE, Krishnamoorthy M, Sharaiha YM, Abramson D (2004) Displacement problem and dynamically scheduling aircraft landings. J Oper Res Soc 41: 1069–1072īeasley JE, Krishnamoorthy M, Sharaiha YM, Abramson D (2000) Scheduling aircraft landings-the static case. In: Proceeding of the 34th winter simulation conference (WSC’02), San Diego, CA, USAīeasley JE (1990) OR-library: distributing test problems by electronic mail. In: 43rd IEEE conference on decision and control, Atlantis, Paradise Island, Bahamasīazargan M, Fleming K, Subramanian P (2002) A simulation study to investigate runway capacity using TAAM. Eur J Oper Res 177: 1180–1196īayen AM, Tomlin CJ, Ye Y, Zhang J (2004) An approximation algorithm for scheduling aircraft with holding time. USA/Europe Air Traffic Management R&D Seminar, Barcelonaīauerle N, Engelhardt-Funke O, Kolonko M (2007) On the waiting time of arriving aircraft and the capacity of airports with one or two runways. In: AIAA guidance, navigation and control conference and exhibit, Keystone, CO, USAīalakrishnan H, Chandran B (2007) Efficient and equitable departure scheduling in real-time: new approaches to old problems. J Schedul 11: 323–346īalakrishnan H, Chandran B (2006) Scheduling aircraft landings under constrained position shifting. Transport Sci 41: 90–106Ītkin JAD, Burke EK, Greenwood JS, Reeson D (2008) On-line decision support for take-off runway scheduling with uncertain taxi times at London heathrow airport. In: Electronic proceedings of the 10th international conference on computer-aided scheduling of public transport, (CASPT2006)Ītkin JAD, Burke EK, Greenwood JS, Reeson D (2007) Hybrid metaheuristics to aid runway scheduling at London heathrow airport. In: Electronic proceedings of the 9th international conference on computer-aided scheduling of public transport, San Diego, CA, USAĪtkin JAD, Burke EK, Greenwood JS, Reeson D (2006) An examination of take-off scheduling constraints at London heathrow airport. PhD thesis, University of Nottingham, UKĪtkin JAD, Burke EK, Greenwood JS, Reeson D (2004) A metaheuristic approach to aircraft departure scheduling at London heathrow airport. Eur J Oper Res 189: 1254–1266Ītkin J Atkin JAD (2008) On-line decision support for take-off runway scheduling with uncertain taxi times at London heathrow airport. In: Proceedings of the 36th annual Hawaii international conference on system science (HICSS’03), Big Island, HI, USAĪrtiouchine K, Baptiste P, Durr C (2008) Runway sequencing with holding patterns. In: AIAA aircraft, technology, integration and operations forum, Los Angeles, CA, USAĪnagnostakis I, Clarke J-P (2003) Runway operations planning: a two-stage solution methodology. PhD thesis, Department of Aeronautics & Astronautics, MIT, USAĪnagnostakis I, Clarke J-P (2002) Runway operations planning: a two-stage heuristic algorithm. In: Proceedings of 12th national conference of the australian society for operations research, Adelaide, Australia, pp 71–90Īnagnostakis I (2004) A multi-objective, decomposition-based algorithm design methodology and its application to runway operations planning. Abela J, Abramson D, Krishnamoorthy M, De Silva A, Mills G (1993) Computing Optimal Schedules for Landing Aircraft.
0 Comments
Leave a Reply. |
Details
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |